+86-18605323568      +86-532-88189758      admin@qdbojia.cn
网站首页 > 产品展示 > 接头硫化机

接头硫化机

  • 接头硫化机
接头硫化机

Technical Parameter

Item

A=800mm

A=1000mm

A=1200mm

A=1400mm

Model

800×830

1000×830

ZLJ-1200×830

1400×830mm

Belt width

800

1000

1200

1400mm

Working pressure when vulcanizing (Mpa)

1.0-3.0Mpa (adjustable)

1.0-3.0Mpa (adjustable)

1.0-3.0Mpa (adjustable)

1.0-3.0Mpa (adjustable)

Vulcanizing temperature

145℃

145℃

145℃

145℃

Temperature difference of heating platen surface(℃)

±3℃

±3℃

±2℃

±3℃

Heating up time (from room temperature to 145℃)

≤30min

≤30min

≤15min

≤30min

Adjustable range of temperature (℃)

0-200℃

0-200℃

0-200℃

0-200℃

Time adjustable range

0-99min

0-99min

0-99min

0-99min

Heating platen size

960*830mm

1220*830mm

1420*830mm

1653*830mm

weight

460kg

700kg

850kg

1050kg

voltage

380V

660V/380V

380V

380V

Working pressure

0---1.8mpa

0---1.8mpa

0---1.8mpa

0---1.8mpa

Motor power

10.2kw

13.1kw

15.5kw

18kw

2. Our service
1. Our team could design the most reasonable machines for the customers according to the customers' products and workshop size.

2. We could provide the detailed drawings of the machines for the customers.

3. Test running: The above machines are all passed inspection of 3~5 hours of full load operation before leaving our factory. And we will take the video and send it to you for inspection. You can use it directly thus saving the time of test-run and expense. And we also warmly welcome to our factory to inspect and test running.
4. If needed,our engineer could install the machines for the customers and give training for their workers.

5. The instruction books of installation and operation will be sent it to the customers together with the machines.

6. We provide 24-hour technical service for the customers. The email address for technical service is tech@qdbojia.cn

7. Warranty: 12 months after installation, if our machines have any problems, please feel free to contact me. We will solve it for you as soon as possible, and give you the best services.

FAQ

1. Delivery time of the rubber machines?
--This is specially designed machine according to your specific requirement.
From engineer designing to production completion, it needs about 25 to 35 days.

2. What does your factory do regarding quality control?
-- We pay much more importance to quality control from the very beginning to the end of production.
Every machine will be fully assembled and carefully tested before shipment.

3. What's the packing for the machines?

-- Usually, The machines are packed by the stretch film first, and then will be packed with wooden cases. We will also fix the machines in order to prevent the machines damaged during the shipment. We also could pack the machines according to the customers' requirements.


4. Are you able to give installation and commissioning overseas? How long time will it take?
--Yes, we can supply overseas service and technical support but customer needs to pay for the cost of the installation.
Small machine usually takes within 2~3 days.
Big plant usually takes about 30 days.

5. How can I trust you to deliver the right machine as I ordered?
--We will absolutely deliver a good quality machine as we discussed and confirmed in the order. We will provide the detailed drawings for the customers after the order is placed. And we will manufacture the machines according to the final detailed drawings.
The core of our company culture is innovation, quality, integrity and efficiency. Also we have had much good cooperation with world famous rubber production manufacturers. If you come to our factory, we can show you're the user around us.

6. How could we go to your factory?
--We are located in Qingdao City, Shandong province, China. The name of airport is Qingdao Liuting airport. We will pick up you at the airport.

If it's very late when the customers arrive at the airport,we also have cooperating hotels near the airport. In order to make the customers have a good rest,we will arrange the hotel for the customers and the hotel customer service will pick the customers up at the airport.

7. How long will it take from the airport to your factory?

-- It will take about one and a half hours from the airport to our factory if there's no traffic jam or bad weather.